Case study · Greeneville

A Greeneville tear-off that found 1,200 sq. ft. of rotten decking.
priced before the work started

Discovered during tear-off. Stopped work, photographed, called the owner with a fixed per-sheet rate before continuing. Final invoice was $1,180 over estimate — exactly the deck-replacement line we’d quoted.

Full case study coming soon. In the meantime, the project file (photos, line-item costs, decisions, surprises) is available on request — email [email protected].

At a glance
City
Greeneville
Product
HP42 HP + 14 OSB sheets + ridge vent
Year
2025
Back to case studies

Want a full write-up on your project?

Get a free estimate Or call (423) 549-2065
📞 Call (423) 549-2065